On the inside face of a parapet or wherever a masonry wall intersects a lower roof i have seen cases where the masonry flashing exits the wall one or more courses above the top of the retaining bar for the roof base flashing.
Flash parapit wall to high roof wall.
Architects of ultra modern.
The roofing squares are locked into a 20 oz.
Water may be entering the coping at the top of the parapet or entering the roof side of the parapet.
Wsrca suggests for walls 24 inches and taller that wall cladding be considered in lieu of membrane wall flashings per detail tp 8a.
Prior to the installation of the parapet coping a metal flashing material shall be adhered to the structural wall.
Bigger step flashing is better.
Finally the housewrap can be laid up on the wall to cover the top of the kickout diverter and step flashings.
The metal flashing shall lap the parapet wall.
Fasten outside face with continuous concealed clip type fasteners or with two concealed discontinuous clips or cladding screws evenly spaced between seams.
Air leakage into and out of everything and everywhere.
Fabrication procedure 1 metal cap flashing.
With it parapet walls are indicated automatically on the roof sketch as flattened panels similar to an unfolded pizza box.
This detail may be used where wall heights are 24 48 inches above roof surface.
The installation of the coping to wall termination provides waterproofing protection and allows for differential movement between the two construction components.
And to make matters worse structurally we also tend to have some issues.
Copper base flashing which extends at least 8 up the wall.
Mortar bridges below the through wall flashing may be allowing water to cross the cavity into the backup wall.
Cut to form a 25mm 1 wide flange for seam fabrication at cap flashing wall transitions.
How to attach flashing to a parapet wall.
No membrane under the parapet flashing.
Accounting for roof penetrations when dealing with parapet walls the extra material needed to cover the vertical surface of the inside face of the parapet isn t the only added factor to take into consideration.
Roof leg and a 7 in.
On walls greater than 36 inches high membrane wall flashing sheets are suggested to be strapped i e installed vertically.
No air control in either the roof assembly or the wall assembly.
Ah but not in the way you think.
See sbs roof systems 12 6 cap flashings base flashings and reglets parallel standards are shown.
I recommend 12 in wide step flashings bent for a 5 in.
This detail shows a flashing condition at a vertical wall or parapet.
No vapor control layer and thermal bridging everywhere.
Water from either of these locations may bypass flashing and enter the backup wall directly.
The profile of specific components their.